We’re on a mission to become the world’s most valued metals and mining business – for the people who invest in us, the people we work and partner with, and the communities around us
Our business
We operate in 35 countries where our 60,000+ employees are working to find better ways to provide the materials the world needs
Our purpose in action
Continuous improvement and innovation are part of our DNA
Innovation
The need for innovation is greater than ever
We supply the metals and minerals used to help the world grow and decarbonise
Iron Ore
The primary raw material used to make steel, which is strong, long-lasting and cost-efficient
Lithium
The lightest of all metals, it is a key element needed for low-carbon technologies
Copper
Tough but malleable, corrosion-resistant and recyclable, and an excellent conductor of heat and transmitter of electricity
Bringing to market materials critical to urbanisation and the transition to a low-carbon economy
Oyu Tolgoi
One of the most modern, safe and sustainable operations in the world
Simandou Project
The world’s largest untapped high-grade iron ore deposit
Western Australia
While iron ore is central to our operations in WA, we have a diverse presence across the state, from salt, lithium, our diamond legacy and our promising copper-gold project
Providing materials the world needs in a responsible way
Climate Change
We’re targeting net zero emissions by 2050
Nature solutions
Our nature-based solutions projects complement the work we're doing to reduce our Scope 1 and 2 emissions
Enabling ESG transparency
Our START™ initiative tracks traceability and responsible production of Rio Tinto materials.
We aim to deliver superior returns to our shareholders while safeguarding the environment and meeting our obligations to wider society
2025 annual results
Announced on Thursday 19 February 2026
Get the latest news, stories and updates
Things You Can't Live Without
Our podcast discussing what needs to happen to create a sustainable future for the everyday items we have come to rely on
Refuelling the mining industry
How can we power the world’s biggest machines with new fuel solutions?
Forging a low-carbon future
How we're working to decarbonise iron ore and steel
Discover more about life at Rio Tinto
Graduates and interns
If you want to drive real change, we have just the place to do it
In-house consulting
Discover how our in-house consultancy team, PACE, offers a unique opportunity to help shape Rio Tinto from the inside
Available jobs
Join our team
NEW YORK--(BUSINESS WIRE)-- Rio Tinto has secured a $1.175 billion financing package from four international lenders to support development of the Rincon lithium project in Argentina’s Salta Province.
The package comprises loans from the International Finance Corporation (IFC), IDB Invest, Export Finance Australia (EFA) and the Japan Bank for International Cooperation (JBIC).
The proceeds will be used to support development of the $2.5 billion Rincon lithium project, which is targeting approximately 60,000 tonnes1 of annual battery grade lithium carbonate capacity.
Construction of the plant started last year including camp expansion works and development of site infrastructure. First production is expected in 2028 with a three-year ramp-up to full capacity. Rincon is expected to have a 40-year mine life.
Rio Tinto’s Chief Executive Aluminium & Lithium Jérôme Pécresse said: “This financing package broadens our funding sources for the Rincon project and supports the continued execution of our lithium growth pipeline, which is underpinned by the attractive long-term outlook driven by the energy transition. We appreciate the strong support from IFC, IDB Invest, Export Finance Australia and JBIC as we progress the Rincon project.”
1 A production target of approximately 53 kt of battery grade lithium carbonate per year for a period of 40 years was previously reported in a release to the ASX dated 4 December 2024 titled “Rincon Project Mineral Resources and Ore Reserves: Table 1”. Rio Tinto confirms that all material assumptions underpinning that production target continue to apply and have not materially changed. Plans are in place to build for a capacity of 60 kt of battery grade lithium carbonate per year with debottlenecking and improvement programs scheduled to unlock this additional throughput.
View source version on businesswire.com: https://www.businesswire.com/news/home/20260310987081/en/
Please direct all enquiries to: media.enquiries@riotinto.com
Media Relations, United Kingdom Matthew Klar M +44 7796 630 637 David Outhwaite M +44 7787 597 493
Media Relations, Australia Matt Chambers M +61 433 525 739 Alyesha Anderson M +61 434 868 118 Rachel Pupazzoni M +61 438 875 469 Bruce Tobin M +61 419 103 454
Media Relations, Canada Simon Letendre M +1 514 796 4973 Malika Cherry M +1 418 592 7293 Vanessa Damha M +1 514 715 2152
Media Relations, US & Latin America Jesse Riseborough M +1 202 394 9480
Investor Relations, United Kingdom Rachel Arellano M +44 7584 609 644 David Ovington M +44 7920 010 978 Laura Brooks M +44 7826 942 797 Weiwei Hu M +44 7825 907 230
Investor Relations, Australia Tom Gallop M +61 439 353 948 Eddie Gan-Och M +61 477 599 714
Rio Tinto plc 6 St James’s Square London SW1Y 4AD United Kingdom T +44 20 7781 2000 Registered in England No. 719885
Rio Tinto Limited Level 43, 120 Collins Street Melbourne 3000 Australia T +61 3 9283 3333 Registered in Australia ABN 96 004 458 404
riotinto.com
Category: Rincon
Source: Rio Tinto