Finding better ways to provide the materials the world needs
Our business
We operate in 35 countries where our 60,000 employees are working to find better ways to provide the materials the world needs
Our purpose in action
Continuous improvement and innovation are part of our DNA
Innovation
The need for innovation is greater than ever
We supply the metals and minerals used to help the world grow and decarbonise
Iron Ore
The primary raw material used to make steel, which is strong, long-lasting and cost-efficient
Lithium
The lightest of all metals, it is a key element needed for low-carbon technologies
Copper
Tough but malleable, corrosion-resistant and recyclable, and an excellent conductor of heat and transmitter of electricity
Bringing to market materials critical to urbanisation and the transition to a low-carbon economy
Oyu Tolgoi
One of the most modern, safe and sustainable operations in the world
Rincon Project
A long-life, low-cost and low-carbon lithium source
Simandou Project
The world’s largest untapped high-grade iron ore deposit
Providing materials the world needs in a responsible way
Climate Change
We’re targeting net zero emissions by 2050
Nature solutions
Our nature-based solutions projects complement the work we're doing to reduce our Scope 1 and 2 emissions
Enabling ESG transparency
Our START™ initiative tracks traceability and responsible production of Rio Tinto materials.
We aim to deliver superior returns to our shareholders while safeguarding the environment and meeting our obligations to wider society
Reports 2024
Download our 2024 suite of reports, including our 2024 Taxes and Royalties Paid Report, detailing $8.4 billion of taxes and royalties paid globally during the year
Get the latest news, stories and updates
Things You Can't Live Without
Our podcast discussing what needs to happen to create a sustainable future for the everyday items we have come to rely on
Refuelling the mining industry
How can we power the world’s biggest machines with new fuel solutions?
Forging a low-carbon future
How we're working to decarbonise iron ore and steel
Discover more about life at Rio Tinto
Graduates and students
If you want to drive real change, we have just the place to do it
In-house consulting
Discover how our in-house consultancy team, PACE, offers a unique opportunity to help shape Rio Tinto from the inside
Available jobs
Join our team
MELBOURNE, Australia--(BUSINESS WIRE)-- Rio Tinto has approved investment of US$180 million and commenced work on the Norman Creek access project at the world-class Amrun bauxite mine on Queensland’s Cape York Peninsula.
The Norman Creek access project will enable mining of the Norman Creek region of Amrun, which holds approximately half of the currently declared Amrun Ore Reserves of 978 million tonnes. [1]
Construction is underway on key infrastructure, including a 19-kilometre haul road, camp accommodation and a communications tower.
First production from Norman Creek is targeted for 2027, with full construction completed in 2028.
Rio Tinto Pacific Operations Aluminium Managing Director Armando Torres said: “Norman Creek is another important step in securing the long-term future of our Weipa operations, and the benefits that mining brings to communities in the region, Queensland, and the nation.
“It will maintain jobs in the region through to at least the middle of this century, ensuring continuity for our people and the Weipa community.
“The decision to approve Norman Creek reflects the quality of Western Cape York’s world-class bauxite deposits, combined with the strong operational improvements our people are making at Amrun that are bolstering our confidence to invest for the long-term.”
In addition to the Norman Creek project, Rio Tinto recently announced it had started early works and a final feasibility study on the Kangwinan project, which includes early works and final engineering studies to increase production capacity at the Amrun bauxite mine.
If approved, Kangwinan would increase annual bauxite production capacity from Rio Tinto’s Weipa Southern operations, by up to 20 million tonnes, in addition to the current 23 million tonnes, and expand export capacity through the Amrun port. The project was named Kangwinan at the request of Traditional Owners, the Wik Waya people.
Production from the Kangwinan project would replace output from the Andoom mine on Cape York and the Gove mine in the Northern Territory, which are both expected to close toward the end of the current decade. First output from the Kangwinan project could be as early as 2029.
The Norman Creek investment is expected to be classified as replacement capital and has been factored into the Group’s capital guidance.
[1] These Ore Reserves were reported in accordance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, 2012 Edition (JORC Code) and the ASX Listing Rules in a release to the ASX dated 19 February 2025 titled “Mineral Resources and Ore Reserves updates: supporting information and Table 1 checklists” (Table 1 release) which is available at riotinto.com. The Amrun Ore Reserves comprise 466 Mt of Proved Ore Reserves @ 54.6% Al2O3 and 8.8% SiO2 and 512 Mt of Probable Ore Reserves @ 54.3% Al2O3 and 9.1% SiO2 for a total of 978 Mt @ 54.4% Al2O3 and 9.0% SiO2. The Competent Person responsible for the information in the Table 1 release that relates to Amrun Ore Reserves is William Saba who is a Member of the Australasian Institute of Mining and Metallurgy (MAusIMM). Rio Tinto confirms that it is not aware of any new information or data that materially affects the information included in the Table 1 release, that all material assumptions and technical parameters underpinning the estimates in the 2024 Annual Report continue to apply and have not materially changed, and that the form and context in which the Competent Person’s findings are presented have not been materially modified. Ore Reserves are reported on a 100% basis
View source version on businesswire.com: https://www.businesswire.com/news/home/20250806935233/en/
Please direct all enquiries to media.enquiries@riotinto.com
Media Relations, United Kingdom Matthew Klar M +44 7796 630 637 David Outhwaite M +44 7787 597 493
Media Relations, Australia Matt Chambers M +61 433 525 739 Rachel Pupazzoni M +61 438 875 469 Bruce Tobin M +61 419 103 454
Media Relations, Canada Simon Letendre M +1 514 796 4973 Malika Cherry M +1 418 592 7293 Vanessa Damha M +1 514 715 2152
Media Relations, US & Latin America Jesse Riseborough M +1 202 394 9480
Investor Relations, United Kingdom Rachel Arellano M: +44 7584 609 644 David Ovington M +44 7920 010 978 Laura Brooks M +44 7826 942 797 Weiwei Hu M +44 7825 907 230
Investor Relations, Australia Tom Gallop M +61 439 353 948 Phoebe Lee M +61 413 557 780
Rio Tinto plc 6 St James’s Square London SW1Y 4AD United Kingdom T +44 20 7781 2000 Registered in England No. 719885
Rio Tinto Limited Level 43, 120 Collins Street Melbourne 3000 Australia T +61 3 9283 3333 Registered in Australia ABN 96 004 458 404
riotinto.com
Category: General
Source: Rio Tinto