Finding better ways to provide the materials the world needs
Our business
We operate in 35 countries where our 60,000 employees are working to find better ways to provide the materials the world needs
Our purpose in action
Continuous improvement and innovation are part of our DNA
Innovation
The need for innovation is greater than ever
We supply the metals and minerals used to help the world grow and decarbonise
Iron Ore
The primary raw material used to make steel, which is strong, long-lasting and cost-efficient
Lithium
The lightest of all metals, it is a key element needed for low-carbon technologies
Copper
Tough but malleable, corrosion-resistant and recyclable, and an excellent conductor of heat and transmitter of electricity
Bringing to market materials critical to urbanisation and the transition to a low-carbon economy
Oyu Tolgoi
One of the most modern, safe and sustainable operations in the world
Rincon Project
A long-life, low-cost and low-carbon lithium source
Simandou Project
The world’s largest untapped high-grade iron ore deposit
Providing materials the world needs in a responsible way
Climate Change
We’re targeting net zero emissions by 2050
Nature solutions
Our nature-based solutions projects complement the work we're doing to reduce our Scope 1 and 2 emissions
Enabling ESG transparency
Our START™ initiative tracks traceability and responsible production of Rio Tinto materials.
We aim to deliver superior returns to our shareholders while safeguarding the environment and meeting our obligations to wider society
Reports 2024
Download our 2024 suite of reports, including our 2024 Taxes and Royalties Paid Report, detailing $8.4 billion of taxes and royalties paid globally during the year
Get the latest news, stories and updates
Things You Can't Live Without
Our podcast discussing what needs to happen to create a sustainable future for the everyday items we have come to rely on
Refuelling the mining industry
How can we power the world’s biggest machines with new fuel solutions?
Forging a low-carbon future
How we're working to decarbonise iron ore and steel
Discover more about life at Rio Tinto
Graduates and students
If you want to drive real change, we have just the place to do it
Empowering families with flexibility
Supporting new parents of any gender with equal access to parental leave
Available jobs
Join our team
MELBOURNE, Australia--(BUSINESS WIRE)-- Rio Tinto will drive development of Australia’s largest solar power project near Gladstone, after agreeing to buy all electricity from the 1.1GW1 Upper Calliope Solar Farm to provide renewable power to Rio Tinto’s Gladstone operations.
The agreement will bring more renewable power into one of Australia’s most important industrial hubs and marks another step towards Rio Tinto’s climate goal of halving its global Scope 1 & 2 carbon emissions this decade2. If combined with more renewable power and suitable firming, transmission and industrial policy, it could also provide the core of a solution to repower Rio Tinto’s three Gladstone production assets - the Boyne aluminium smelter, the Yarwun alumina refinery and the Queensland Alumina refinery.
Under a new power purchase agreement (PPA) signed with European Energy Australia, Rio Tinto will buy all power generated from the Upper Calliope solar farm for 25 years. The plant will be built and operated by European Energy, at a site about 50 kilometres south-west of Gladstone, pending development and grid connection approvals.
Once approved and developed, Upper Calliope would have the potential to lower Rio Tinto's operating carbon emissions by 1.8 million tonnes per year.
Rio Tinto Chief Executive Jakob Stausholm said “This agreement is a first important step in our work to repower our Gladstone operations and illustrates our commitment to keeping sustainably powered industry in Central Queensland.
“The task remains challenging, but we have a pathway to provide the competitive, firmed power our Gladstone plants need and we are continuing to work hard with all stakeholders, including the Queensland and Australian governments, on getting there.
“Competitive capacity, firming, and transmission, are critical to developing a modern energy system that can ensure more large-scale renewables development in Queensland and help guarantee the future of Australian industry.”
Once approved, construction of the Upper Calliope plant is targeted to start in 2025 or 2026 and, when complete, it will provide enough electricity to meet about 5% of Queensland’s current demand. The plant, which is expected to take two years to construct, will cover 2400 hectares, employ 1000 people during construction and support 100 direct and indirect jobs when operating.
European Energy CEO Erik Andersen said “European Energy is proud to be a strategic partner in this project with Rio Tinto. Our commitment to providing renewable and reliable energy aligns perfectly with Rio Tinto's ambitious climate goals. The Upper Calliope Solar Farm is not just a solar power project; it's a testament to our shared vision for a greener future.
“By supplying renewable energy to one of Australia's key industrial hubs, we are setting a new standard for industrial energy consumption. This project underlines our dedication to driving the transition towards renewable energy in Australia and demonstrates the potential of solar power in transforming the energy landscape of the region. We look forward to continuing our collaboration with Rio Tinto and other stakeholders to create a sustainable and energy-efficient future for Australia.”
Upper Calliope is the first successful applicant in a formal Request for Proposals made by Rio Tinto for renewable power and firming projects in Central and Southern Queensland.
Rio Tinto continues to assess other proposals, solutions and partnerships to help competitively meet the energy needs of its three production assets in the Gladstone region. These assets require more than 1GW of reliable power to operate, which equates to over 4GW of quality wind or solar power with firming. Potential further electrification of plant processes could increase their electricity demand in the future.
1 1.1GWac or 1.3GWp 2 From 2018 levels
View source version on businesswire.com: https://www.businesswire.com/news/home/20240123544880/en/
Please direct all enquiries to media.enquiries@riotinto.com
Media Relations, United Kingdom Matthew Klar M +44 7796 630 637 David Outhwaite M +44 7787 597 493
Media Relations, Australia Matt Chambers M +61 433 525 739 Jesse Riseborough M +61 436 653 412 Alyesha Anderson M +61 434 868 118 Michelle Lee M +61 458 609 322
Media Relations, Americas Simon Letendre M +1 514 796 4973 Malika Cherry M +1 418 592 7293 Vanessa Damha M +1 514 715 2152
Investor Relations, United Kingdom Menno Sanderse M +44 7825 195 178 David Ovington M +44 7920 010 978 Laura Brooks M +44 7826 942 797
Investor Relations, Australia Tom Gallop M +61 439 353 948 Amar Jambaa M +61 472 865 948
Rio Tinto plc 6 St James’s Square London SW1Y 4AD United Kingdom T +44 20 7781 2000 Registered in England No. 719885
Rio Tinto Limited Level 43, 120 Collins Street Melbourne 3000 Australia T +61 3 9283 3333 Registered in Australia ABN 96 004 458 404
riotinto.com
Category - General
Source: Rio Tinto