Finding better ways to provide the materials the world needs
Our business
We operate in 35 countries where our 60,000 employees are working to find better ways to provide the materials the world needs
Our purpose in action
Continuous improvement and innovation are part of our DNA
Innovation
The need for innovation is greater than ever
We supply the metals and minerals used to help the world grow and decarbonise
Iron Ore
The primary raw material used to make steel, which is strong, long-lasting and cost-efficient
Lithium
The lightest of all metals, it is a key element needed for low-carbon technologies
Copper
Tough but malleable, corrosion-resistant and recyclable, and an excellent conductor of heat and transmitter of electricity
Bringing to market materials critical to urbanisation and the transition to a low-carbon economy
Oyu Tolgoi
One of the most modern, safe and sustainable operations in the world
Rincon Project
A long-life, low-cost and low-carbon lithium source
Simandou Project
The world’s largest untapped high-grade iron ore deposit
Providing materials the world needs in a responsible way
Climate Change
We’re targeting net zero emissions by 2050
Nature solutions
Our nature-based solutions projects complement the work we're doing to reduce our Scope 1 and 2 emissions
Enabling ESG transparency
Our START™ initiative tracks traceability and responsible production of Rio Tinto materials.
We aim to deliver superior returns to our shareholders while safeguarding the environment and meeting our obligations to wider society
Reports 2024
Download our 2024 suite of reports, including our 2024 Taxes and Royalties Paid Report, detailing $8.4 billion of taxes and royalties paid globally during the year
Get the latest news, stories and updates
Things You Can't Live Without
Our podcast discussing what needs to happen to create a sustainable future for the everyday items we have come to rely on
Refuelling the mining industry
How can we power the world’s biggest machines with new fuel solutions?
Forging a low-carbon future
How we're working to decarbonise iron ore and steel
Discover more about life at Rio Tinto
Graduates and students
If you want to drive real change, we have just the place to do it
Empowering families with flexibility
Supporting new parents of any gender with equal access to parental leave
Available jobs
Join our team
Rio Tinto invests to maintain anode production at Grande-Baie smelter
18 June 2024
SAGUENAY – Rio Tinto will invest US$165 million (CA$226 million) in its Grande-Baie smelter to refurbish two anode baking furnaces that have reached the end of their useful life. The company will also carry out feasibility studies for the eventual replacement of the scrubbers and overhead bridge cranes at the anode production centre.
The work to rebuild the concrete shell and refractory lining of the anode baking furnaces will be carried out over two years, in 2025 and 2026. The new equipment will ensure a competitive supply of anodes to the Grande-Baie and Laterrière plants for decades to come.
Rio Tinto will offset the carbon emissions related to the construction project through various initiatives like planting trees near the aluminium smelter.
Grande-Baie and Laterrière Operations Director Martin Lavoie said: ‘‘The refurbishment of the Grande-Baie smelter’s anode baking furnaces is a major investment that will ensure the sustainability and competitiveness of responsible aluminium production in the region for decades to come and will generate significant economic benefits. We are very happy to be completing this project over the next years in collaboration with our employees and local business partners.”
Most of the economic benefits associated with the project will be generated in Quebec. At the peak of the project, about 185 workers should be on site.
Rio Tinto completed the replacement of its anode baking furnaces at the Alma aluminium smelter in 2021.
Relations avec les médias
Malika Cherry
C +1 418 592-7293
6 St James’s Square Londres SW1Y 4AD Royaume-Uni T +44 20 7781 2000
Enregistré en Angleterre
No. 719885
120 Collins Street, 43ième étage
Melbourne 3000
Australie
T +61 3 9283 3333
Enregistré en Australie
ABN 96 004 458 404
Category: Saguenay