Finding better ways to provide the materials the world needs
Our business
We operate in 35 countries where our 60,000 employees are working to find better ways to provide the materials the world needs
Our purpose in action
Continuous improvement and innovation are part of our DNA
Innovation
The need for innovation is greater than ever
We supply the metals and minerals used to help the world grow and decarbonise
Iron Ore
The primary raw material used to make steel, which is strong, long-lasting and cost-efficient
Lithium
The lightest of all metals, it is a key element needed for low-carbon technologies
Copper
Tough but malleable, corrosion-resistant and recyclable, and an excellent conductor of heat and transmitter of electricity
Bringing to market materials critical to urbanisation and the transition to a low-carbon economy
Oyu Tolgoi
One of the most modern, safe and sustainable operations in the world
Rincon Project
A long-life, low-cost and low-carbon lithium source
Simandou Project
The world’s largest untapped high-grade iron ore deposit
Providing materials the world needs in a responsible way
Climate Change
We’re targeting net zero emissions by 2050
Nature solutions
Our nature-based solutions projects complement the work we're doing to reduce our Scope 1 and 2 emissions
Enabling ESG transparency
Our START™ initiative tracks traceability and responsible production of Rio Tinto materials.
We aim to deliver superior returns to our shareholders while safeguarding the environment and meeting our obligations to wider society
Reports 2024
Download our 2024 suite of reports, including our 2024 Taxes and Royalties Paid Report, detailing $8.4 billion of taxes and royalties paid globally during the year
Get the latest news, stories and updates
Things You Can't Live Without
Our podcast discussing what needs to happen to create a sustainable future for the everyday items we have come to rely on
Refuelling the mining industry
How can we power the world’s biggest machines with new fuel solutions?
Forging a low-carbon future
How we're working to decarbonise iron ore and steel
Discover more about life at Rio Tinto
Graduates and students
If you want to drive real change, we have just the place to do it
In-house consulting
Discover how our in-house consultancy team, PACE, offers a unique opportunity to help shape Rio Tinto from the inside
Available jobs
Join our team
MELBOURNE, Australia--(BUSINESS WIRE)-- Rio Tinto Chief Executive Jakob Stausholm said: “We built further momentum in our Pilbara iron ore business for the quarter, and now expect to deliver shipments in the upper half of our guidance range for the year. The ramp-up of the Oyu Tolgoi underground mine progressed ahead of plan, and we remain on track to more than triple its copper production by the end of the decade. Production downgrades during the quarter highlight that we still have much more to do elsewhere, as we roll out the Safe Production System to create stability and achieve excellence across our global portfolio.
“We continued to take disciplined measures to grow in the materials the world needs for the energy transition, with investments to expand our low carbon aluminium production and increase our underground copper production at Kennecott.
“We are taking practical steps and making investments to decarbonise, being the first to convert an open pit mine to renewable diesel at our Boron operations, signing a memorandum of understanding with Baowu to explore decarbonisation of the steel value chain and delivering first production from our ground-breaking BlueSmelting demonstration plant at Sorel-Tracy in Quebec in July.”
Production*
Quarter 2 2023
vs Q2 2022
vs Q1 2023
H1 2023
vs HY 2022
Pilbara iron ore shipments (100% basis) (Mt)
79.1
-1%
-4%
161.7
+7%
Pilbara iron ore production (100% basis) (Mt)
81.3
+3%
+2%
160.5
Bauxite (Mt)
13.5
-5%
+12%
25.6
-8%
Aluminium (kt)
814
+11%
+4%
1,598
+9%
Mined Copper (consolidated basis) (kt)
145
0%
290
Titanium dioxide slag (kt)
303
+6%
589
IOC** iron ore pellets & concentrate (Mt)
2.1
-21%
-18%
4.6
*Rio Tinto share unless otherwise stated
**Iron Ore Company of Canada
Q2 2023 operational highlights and other key announcements
All figures in this report are unaudited. All currency figures in this report are US dollars, and comments refer to Rio Tinto’s share of production, unless otherwise stated.
The full second quarter production results are available here
1 The NRS Mineral Resources and Ore Reserves, together with the Lower Commercial Skarn (LCS) Mineral Resources and Ore Reserves, form the Underground Skarns Mineral Resources and Ore Reserves.
2 This production target for 2023 to 2033 is underpinned 25% by Probable Ore Reserves, 9% by Indicated Resources, and 66% by Inferred Resources. Mined copper is reported as total recoverable metal. These estimates of Mineral Resources and Ore Reserves were reported in a release dated 20 June 2023 titled “Rio Tinto Kennecott Mineral Resources and Ore Reserves” (Table 1 Release) which is available on Rio Tinto's website at resources & reserves (riotinto.com) and have been prepared by Competent Persons in accordance with the requirements of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, 2012 (JORC Code) and the ASX Listing Rules.
This announcement is authorised for release to the market by Steve Allen, Rio Tinto’s Group Company Secretary.
LEI: 213800YOEO5OQ72G2R82
Classification: 3.1 Additional regulated information required to be disclosed under the laws of a Member State
View source version on businesswire.com: https://www.businesswire.com/news/home/20230718852495/en/
Please direct all enquiries to media.enquiries@riotinto.com
Media Relations, United Kingdom Matthew Klar M +44 7796 630 637 David Outhwaite M +44 7787 597 493
Media Relations, Australia Matt Chambers M +61 433 525 739 Jesse Riseborough M +61 436 653 412 Alyesha Anderson M +61 434 868 118
Media Relations, Americas Simon Letendre M +1 514 796 4973 Malika Cherry M +1 418 592 7293
Investor Relations, United Kingdom Menno Sanderse M +44 7825 195 178 David Ovington M +44 7920 010 978 Danielle Smith M +44 7788 190 672
Investor Relations, Australia Tom Gallop M +61 439 353 948 Amar Jambaa M +61 472 865 948
Rio Tinto plc 6 St James’s Square London SW1Y 4AD United Kingdom T +44 20 7781 2000 Registered in England No. 719885
Rio Tinto Limited Level 43, 120 Collins Street Melbourne 3000 Australia T +61 3 9283 3333 Registered in Australia ABN 96 004 458 404
riotinto.com
Category: General
Source: Rio Tinto