Finding better ways to provide the materials the world needs
Our business
We operate in 35 countries where our 60,000 employees are working to find better ways to provide the materials the world needs
Our purpose in action
Continuous improvement and innovation are part of our DNA
Innovation
The need for innovation is greater than ever
We supply the metals and minerals used to help the world grow and decarbonise
Iron Ore
The primary raw material used to make steel, which is strong, long-lasting and cost-efficient
Lithium
The lightest of all metals, it is a key element needed for low-carbon technologies
Copper
Tough but malleable, corrosion-resistant and recyclable, and an excellent conductor of heat and transmitter of electricity
Bringing to market materials critical to urbanisation and the transition to a low-carbon economy
Oyu Tolgoi
One of the most modern, safe and sustainable operations in the world
Rincon Project
A long-life, low-cost and low-carbon lithium source
Simandou Project
The world’s largest untapped high-grade iron ore deposit
Providing materials the world needs in a responsible way
Climate Change
We’re targeting net zero emissions by 2050
Nature solutions
Our nature-based solutions projects complement the work we're doing to reduce our Scope 1 and 2 emissions
Enabling ESG transparency
Our START™ initiative tracks traceability and responsible production of Rio Tinto materials.
We aim to deliver superior returns to our shareholders while safeguarding the environment and meeting our obligations to wider society
Reports 2024
Download our 2024 suite of reports, including our 2024 Taxes and Royalties Paid Report, detailing $8.4 billion of taxes and royalties paid globally during the year
Get the latest news, stories and updates
Things You Can't Live Without
Our podcast discussing what needs to happen to create a sustainable future for the everyday items we have come to rely on
Refuelling the mining industry
How can we power the world’s biggest machines with new fuel solutions?
Forging a low-carbon future
How we're working to decarbonise iron ore and steel
Discover more about life at Rio Tinto
Graduates and students
If you want to drive real change, we have just the place to do it
Empowering families with flexibility
Supporting new parents of any gender with equal access to parental leave
Available jobs
Join our team
LONDON--(BUSINESS WIRE)-- Rio Tinto has carefully considered the concerns raised by minority shareholders of Turquoise Hill Resources Ltd. (“Turquoise Hill”) in relation to the dissent and dispute resolution provisions in the agreements (the “Agreements”) it entered into with certain funds and other entities related to Pentwater Capital Management LP and SailingStone Capital Partners LLC (the “Named Securityholders”) that were previously announced on 1 November 2022. Rio Tinto in good faith has been negotiating with the Special Committee of Turquoise Hill on comparable provisions for other minority shareholders. However, notwithstanding the parties best efforts, those negotiations have been unsuccessful.
Rio Tinto has now agreed to terminate the Agreements with the Named Securityholders. While Rio Tinto’s proposed transaction to acquire, byway of a plan of arrangement (the “Arrangement”), the approximately 49% of the issued and outstanding shares of Turquoise Hill that Rio Tinto does not own for C$43.00 per share in cash (the “Proposed Transaction”) will proceed, there is no assurance that any of the Named Securityholders will continue to withhold their vote or whether any of them will vote for or against the Arrangement. Copies of the termination agreements are being publicly filed by Rio Tinto as part of its 13D amendment in the U.S.
All minority shareholders of Turquoise Hill will have access to the same dissent rights and statutory process through the Yukon Courts for Rio Tinto’s Proposed Transaction as described in Turquoise Hill’s circular dated 27 September 2022 (the “Circular”). To further support the Proposed Transaction, Rio Tinto irrevocably commits to:
Rio Tinto Copper Chief Executive Bold Baatar said: “We have acknowledged feedback received from minority shareholders and returned to the proposal originally unanimously recommended by the Turquoise Hill Special Committee. We will work with the Turquoise Hill Special Committee to secure a new shareholder meeting date so that the Proposed Transaction can be voted on by minority shareholders as soon as practicable. We continue to believe that a premium of 67% for their shares and removal of financial uncertainty is an attractive proposition for minority shareholders.”
Further details on the procedure to become an Electing Shareholder and how an oppression claim can be served on or provided to Turquoise Hill and Rio Tinto will be provided on or before 23 November 2022.
Rio Tinto confirms that there is no floor or minimum to the determination of “fair value” under any dissent proceedings and no assurance that dissenting shareholders will receive the full C$43.00 for their shares. The dissent process is a time consuming and lengthy process that introduces uncertainty in relation to the consideration to be received and the potential for substantial legal costs to the dissenting shareholder. Rio Tinto intends to vigorously defend all proceedings and claims. Additional details regarding the dissent process are described in the Circular. It is recommended that minority shareholders seek independent legal advice if they wish to exercise their dissent rights.
Rio Tinto is making the irrevocable commitments outlined above to all minority shareholders of Turquoise Hill. Rio Tinto confirms that it has no other agreement, commitment or understanding with any of the Named Securityholders as to how they will vote in respect of the Arrangement, whether they will continue to exercise their dissent rights, how any dissent proceedings or claims will be conducted or otherwise dealt with, or regarding any other matter.
As previously announced by Turquoise Hill, the Special Meeting of shareholders to vote on the Proposed Transaction has been postponed. Rio Tinto has requested the Turquoise Hill Special Committee to proceed with a shareholder meeting for the Arrangement as soon as possible.
The Proposed Transaction represents Rio Tinto’s best and final all-cash transaction price of C$43.00 per share, which provides Turquoise Hill minority shareholders the option to realise significant and immediate value. This represents a premium of 67% to Turquoise Hill’s closing price of C$25.68 per share on 11 March 2022, the day prior to Rio Tinto’s initial public proposal to acquire Turquoise Hill. Since 11 March 2022, publicly traded peer copper producer share prices have declined by 24%1.
Rio Tinto is continuing to work towards the completion of the Proposed Transaction that will simplify governance, improve efficiency and create greater certainty of funding for the long-term success of the Oyu Tolgoi copper project.
Rio Tinto Canadian early warning disclosure
Rio Tinto currently beneficially owns 102,196,643 common shares of TRQ, representing approximately 51% of the issued and outstanding common shares of TRQ. Rio Tinto also has anti-dilution rights that permit it to acquire additional securities of Turquoise Hill so as to maintain its proportionate equity interest in TRQ from time to time.
A copy of the related early warning report may be obtained from Rio Tinto’s Group Company Secretary. The head office of TRQ is located at 1 Place Ville-Marie, Suite 3680, Montreal, Quebec, Canada H3B 3P2.
Additional disclosures
This press release does not constitute an offer to buy or sell or the solicitation of an offer to sell or buy any securities. Any offers, solicitations or offers to buy, or any sales of securities will be made in accordance with registration and other requirements under applicable law.
Forward-Looking Statements
This press release includes “forward-looking statements” within the meaning of the U.S. Private Securities Litigation Reform Act of 1995. All statements other than statements of historical facts included in this release, are forward-looking statements. The words “intend”, “forecast”, “project”, “anticipate”, “estimate”, “plan”, “believes”, “expects”, “may”, “should”, “will”, “target”, “pursue”, “seek” or similar expressions, commonly identify such forward-looking statements. Such forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Among the factors that could cause actual results to differ materially include, but are not limited to, those relating to whether the Arrangement will be consummated. Rio Tinto expressly disclaims any obligation or undertaking (except as required by applicable law, the UK Listing Rules, the Disclosure Guidance and Transparency Rules of the Financial Conduct Authority and the Listing Rules of the Australian Securities Exchange) to release publicly any updates or revisions to any forward-looking statement contained herein to reflect any change in its expectations with regard thereto or any change in events, conditions or circumstances on which any such statement is based. All information provided in this press release, including the forward-looking statements herein, speak only as of the date of this press release.
This announcement contains inside information.
The person responsible for arranging and authorising the release of this announcement on behalf of Rio Tinto is Steve Allen, Group Company Secretary.
LEI: 213800YOEO5OQ72G2R82
Classification: 3.1. Information disclosed under article 19 of the Market Abuse Regulation.
____________________ 1 Based on the simple average share price performance, between 11 March 2022 (being the last trading day immediately prior to Rio Tinto’s proposal) and 16 November 2022, of Southern Copper, Freeport, First Quantum and Lundin Mining, representing Turquoise Hill’s disclosed peer set in its most recent results presentation, however excluding OZ Minerals.
View source version on businesswire.com: https://www.businesswire.com/news/home/20221117006089/en/
Please direct all enquiries to media.enquiries@riotinto.com
Media Relations, UK Matthew Klar M+ 44 7796 630 637 David Outhwaite M +44 7787 597 493
Media Relations, Americas Simon Letendre M +514 796 4973 Malika Cherry M +1 418 592 7293
Media Relations, Australia Matt Chambers M +61 433 525 739 Jesse Riseborough M +61 436 653 412
Investor Relations, UK Menno Sanderse M: +44 7825 195 178 David Ovington M +44 7920 010 978 Clare Peever M +44 7788 967 877
Investor Relations, Australia Tom Gallop M +61 439 353 948 Amar Jambaa M +61 472 865 948
Rio Tinto plc 6 St James’s Square London SW1Y 4AD United Kingdom T +44 20 7781 2000 Registered in England No. 719885
Rio Tinto Limited Level 43, 120 Collins Street Melbourne 3000 Australia T +61 3 9283 3333 Registered in Australia ABN 96 004 458 404
riotinto.com Category: Oyu Tolgoi
Source: Rio Tinto