Finding better ways to provide the materials the world needs
Our business
We operate in 35 countries where our 60,000 employees are working to find better ways to provide the materials the world needs
Our purpose in action
Continuous improvement and innovation are part of our DNA
Innovation
The need for innovation is greater than ever
We supply the metals and minerals used to help the world grow and decarbonise
Iron Ore
The primary raw material used to make steel, which is strong, long-lasting and cost-efficient
Lithium
The lightest of all metals, it is a key element needed for low-carbon technologies
Copper
Tough but malleable, corrosion-resistant and recyclable, and an excellent conductor of heat and transmitter of electricity
Bringing to market materials critical to urbanisation and the transition to a low-carbon economy
Oyu Tolgoi
One of the most modern, safe and sustainable operations in the world
Rincon Project
A long-life, low-cost and low-carbon lithium source
Simandou Project
The world’s largest untapped high-grade iron ore deposit
Providing materials the world needs in a responsible way
Climate Change
We’re targeting net zero emissions by 2050
Nature solutions
Our nature-based solutions projects complement the work we're doing to reduce our Scope 1 and 2 emissions
Enabling ESG transparency
Our START™ initiative tracks traceability and responsible production of Rio Tinto materials.
We aim to deliver superior returns to our shareholders while safeguarding the environment and meeting our obligations to wider society
Reports 2024
Download our 2024 suite of reports, including our 2024 Taxes and Royalties Paid Report, detailing $8.4 billion of taxes and royalties paid globally during the year
Get the latest news, stories and updates
Things You Can't Live Without
Our podcast discussing what needs to happen to create a sustainable future for the everyday items we have come to rely on
Refuelling the mining industry
How can we power the world’s biggest machines with new fuel solutions?
Forging a low-carbon future
How we're working to decarbonise iron ore and steel
Discover more about life at Rio Tinto
Graduates and students
If you want to drive real change, we have just the place to do it
In-house consulting
Discover how our in-house consultancy team, PACE, offers a unique opportunity to help shape Rio Tinto from the inside
Available jobs
Join our team
Rio Tinto’s Resolution Copper project in the US has achieved a major permitting milestone with the release of an independently prepared Draft Environmental Impact Statement (DEIS) for the project. The rigorous review, conducted by the US Forest Service over a six year period included broad public engagement.
Resolution, one of the most significant undeveloped copper deposits in the world, started the US permitting process in 2013 and the US Forest Service has conducted a comprehensive independent review under the National Environmental Policy Act (NEPA). The publication of the DEIS triggers a further public consultation process over a 90 day period, which will inform the final Environmental Impact Statement (EIS), and the next steps in the permitting process for the project.
Rio Tinto chief executive Copper & Diamonds Arnaud Soirat said "This an important milestone for Resolution, with the future development of the project being shaped by years of engagement with the local community and extensive independent study by the US Forest Service.
"Achieving this significant milestone in the rigorous US permitting process allows us to continue progressing one of the world’s most significant untapped copper deposits towards development. Resolution has the potential to supply up to 25 per cent of the United States’ copper demand and complements Rio Tinto’s other copper projects.
"Long-term copper fundamentals remain strong – with supply challenged and demand driven by the adoption of electric vehicles, the electrification of industry and a growing share of renewables in the energy mix. Rio Tinto will be well positioned to benefit from this demand outlook and to provide North American manufacturers with the materials that are essential to their products."
The project partners will have spent over $2 billion (Rio Tinto share $1.1 billion) by 2020 to develop and permit the Resolution copper project, including $302 million of additional expenditure approved earlier this year. Work being undertaken includes reclamation of the historic Magma Copper Mine site, sinking a second shaft to mining depth, rehabilitating an existing shaft, extensive drilling and ore body testing, and the permitting and public engagement process.
Notes for editors
1. Resolution Copper Mining is a limited liability company owned 55 per cent by Rio Tinto and 45 per cent by BHP. Funding is proportional among the project partners.
2. The Tonto National Forest (part of the US Forest Service) is the lead federal agency for the federal review of the Resolution mine plan and land exchange and is responsible for preparation of the environmental impact statement (EIS) under the NEPA. Under US law, a final EIS and Record of Decision is required to advance the mine and complete a land exchange between Resolution and the US government.
3. The US Forest Service’s full process schedule and other detailed information on the NEPA process is available at: https://www.resolutionmineeis.us/documents/authors/usfs
4. The Forest Service completed a major aspect of the permitting process and protection and conservation of a culturally significant natural feature in January 2018 with the finalisation of the Apache Leap Special Management area which was required by the US Congress in legislation that authorises a land exchange between Resolution and the federal government.