Production & reserves

Copper

(Rio Tinto interest 100% unless otherwise shown)

Mine Location Access Title/lease
Escondida (30%) Atacama Desert, Chile Pipeline and road to deep sea port at Coloso Rights conferred by Government under Chilean Mining Code
Grasberg joint venture (40%) Papua, Indonesia Pipeline, road and port Indonesian Government Contracts of Work expire in 2021 with option of two ten year extensions
Kennecott Utah Copper
Bingham Canyon
Near Salt Lake City, Utah, US Pipeline, road and rail Owned
Northparkes (80%) Goonumbla, New South Wales, Ausralia Road and rail State Government mining lease issued in 1991 for 21 years
Palabora (58%) Phalaborwa, Limpopo Province, South Africa Road and rail Lease from South African Government until deposits depleted. Base metal claims owned by Palabora

Mine History Type of mine Power source
Escondida (30%) Production started in 1990 and expanded in phases to 2002 when new concentrator was completed; production from Norte started in 2005 and the sulphide leach produced the first cathode during 2006 Open pit Supplied from SING grid under various contracts with Norgener, Gas Atacama and Edelnor
Grasberg joint venture (40%) Joint venture interest acquired 1995. Capacity expanded to over 200,000 tonnes of ore per day in 1998 with addition of underground production of more than 35,000 tonnes per day in 2003 with an expansion to a sustained rate of 50,000 tonnes per day in mid 2007 Open pit and underground Long term contract with US-Indonesian consortium operated purpose built coal fired generating station
Kennecott Utah Copper
Bingham Canyon
Interest acquired in 1989. Modernisation includes smelter complex and expanded tailings dam Open pit On site generation supplemented by long term contracts with Utah Power and Light
Northparkes (80%) Production started in 1995; interest acquired in 2000 Open pit and underground Supplied from State grid
Palabora (58%) Development of 20 year underground mine commenced 1996 with open pit closure in 2003 Underground Supplied by ESKOM via grid network