Performance

Group projects

In light of changing demand dynamics in the aluminium industry and budgetary constraints, Rio Tinto Alcan has decided in 2008 to defer certain projects in its capital expenditure programme. It has reduced its capital expenditure budget for 2009 and plans to shut down certain of its smelters during 2009. Despite these reductions, the group will selectively continue to commit capital to certain high priority projects during 2009 and also remains prepared to rapidly recommence projects that have been deferred as and when market conditions improve.

Bauxite & Alumina

Weipa (Rio Tinto: 100 per cent)
A US$30 million feasibility study is under way to develop a new bauxite operation to the south of the existing Weipa bauxite mine and port. If approved, Weipa's total bauxite production capacity would increase from 21 million tonnes in 2008 to 35 million tonnes. The mine development would take three years to construct.

Yarwun (Rio Tinto: 100 per cent)
Expansion of the Yarwun alumina refinery in Gladstone, Queensland, is expected to cost about US$1.8 billion with most of this already committed. The expansion will increase capacity to 3.4 million tonnes per annum and is expected to more than double annual production by 2011. First shipments are expected towards the end of 2010.

Further to the group's ongoing commitment to reduce greenhouse gas emissions and improve energy efficiency, the refinery will incorporate a 160 megawatt gas fired cogeneration facility, thus making gas the primary fuel source. The facility is expected to reduce carbon dioxide emissions per tonne of alumina by 35 per cent relative to coal.

The expanded refinery is expected to operate in the second quartile of the industry cash cost curve. There remains potential for the refinery to be further expanded to over four million tonnes per annum.

Gove (Rio Tinto: 100 per cent)
The 1.8 million tonnes per annum expansion of the Gove alumina refinery in Australia continues, although technical challenges and soft market conditions resulted in 2008 production of 2.3 million tonnes.

Associated infrastructure includes a deep water port, a township and an oil fired power station. The expansion cost is currently US$2.3 billion and is expected to bring the Gove refinery to a total capacity of 3.0 million tonnes per annum, making it one of the largest alumina refineries in the world. Following completion of the expansion, the refinery is expected to operate in the second quartile of the industry cash cost curve. Alternative energy sources (such as coal which could be backhauled by the bauxite ships) are currently being evaluated, which could result in a further reduction in cash operating costs.

São Luis - Alumar (Rio Tinto: 10 per cent)
A 2.1 million tonnes per annum expansion of the Alumar refinery in Brazil (Rio Tinto Alcan share 210,000 tonnes) is under way and progress on construction is approximately 85 per cent advanced as of 31 December 2008. The project will cost an estimated US$200 million (Rio Tinto's share). Alumar is expected to be positioned in the first quartile of the industry operating cost curve once construction is completed in mid 2009.

Guinea (Rio Tinto: 50 per cent)
In May 2004, Rio Tinto Alcan and Alcoa signed a memorandum of understanding for the proposed development and construction of an alumina refinery in the Boké region of Guinea. The refinery, with a proposed initial capacity of 1.7 million tonnes per annum, would be built in the Kamsar area and would receive its bauxite supply from the Compagnie des Bauxites de Guinée, a joint venture in which Rio Tinto Alcan has a 22.95 per cent indirect interest through its participation in Halco Mining. A prefeasibility study has already been completed and the project is expected to be positioned in the first quartile of the industry cost curve.

Madagascar (Rio Tinto: 51 per cent)
Options for development of a greenfield bauxite mine and alumina refinery in Madagascar in partnership with a Malagasy company are currently being considered. The preliminary concept study has been completed and this indicates potential for a 1.85 million tonnes per annum refinery with expansion capability to 3.7 million tonnes per annum. Rio Tinto Alcan will continue with its studies for this project.

Primary Metal

Sohar (Rio Tinto: 20 per cent)
On 12 June 2008, Sohar Aluminium poured the first metal at its newly constructed smelter in Oman. The state of the art smelter uses Rio Tinto Alcan's benchmark AP 36 technology - the most efficient and environmentally friendly technology commercially available. With an initial capacity of 360,000 tonnes per annum, the smelter is on track to reach full production in the first quarter of 2009. In addition to its equity interest in the project, Rio Tinto Alcan assumes responsibility for technical and operational support as well as sales and marketing of all metal exported. The smelter is expected to be positioned in the first quartile of the industry cost curve. A second potline of similar size is currently being discussed among the joint venture partners. Under the original agreement, Rio Tinto Alcan has rights to up to 60 per cent of this second potline.

Hydropower (Rio Tinto: 100 per cent)
On 28 October 2008, the group announced a US$228 million investment in a new 225 megawatt high efficiency turbine at the Shipshaw power station in Saguenay, Quebec, Canada. The project is expected to be completed in December 2012. The Shipshaw power station is a major component of Rio Tinto Alcan's extensive hydroelectric network, which has a total capacity of approximately 2,919 megawatts in Quebec. Furthermore, on 30 January 2008, the group announced an investment in its Lochaber, Scotland hydroelectric facilities, which will include the installation of new hydroelectric turbo generator.

Spent potlining facility (Rio Tinto: 100 per cent)
In June 2008, Rio Tinto Alcan inaugurated its US$225 million facility for the treatment of spent potlining. Located in Saguenay, Quebec, this unique industrial scale pilot plant is expected to have the capacity to recycle approximately 80,000 tonnes of spent potlining per year using proprietary technology. Spent potlining is the residual material generated in the de-lining of pots in the smelting of aluminium, composed of carbon and various inert elements. It is typically pre-treated and put in landfill with strict precautions, but the new recycling process will enable spent potlining components to be recycled, providing the aluminium industry with a sustainable solution for these by-products.

Kitimat (Rio Tinto: 100 per cent)
In October 2008, Rio Tinto announced an additional sustaining investment of US$300 million in the modernisation of the Kitimat aluminium smelter in British Columbia, Canada, bringing total investments in the project to date to US$500 million. Full scale investment in the modernisation project of about US$2.5 billion has been delayed pending an improvement in market conditions.

The modernisation project will replace outdated smelting methods with industry leading AP35+ prebake technology and increase current production from 245,000 tonnes per year to approximately 400,000 tonnes per year, representing expansion of more than 60 per cent. The facility will take increased advantage of available power from the Kemano hydroelectric facility, with a capacity of 896 megawatts, and leverage access to the Pacific Rim in terms of raw materials and metal markets. When completed, the smelter is expected to be positioned in the first quartile of the industry cost curve.

AP50 pilot plant, Quebec (Rio Tinto: 100 per cent)
In May 2008, Rio Tinto Alcan announced that it is going forward with a pre-feasibility study for two additional phases to the AP50 pilot plant for which preparatory work has begun in Saguenay, Quebec. The study is evaluating the potential for an additional 140,000 tonnes of capacity to the pilot plant as well as a possible subsequent expansion. This AP50 pilot plant will use the newest generation of AP technology. It will be powered exclusively by hydroelectricity. Representing a potential investment of up to US$2.5 billion, the expanded plant would also become the platform for future AP technology developments.

Alma (Rio Tinto: 100 per cent)
The Alma smelter in Quebec is one of Rio Tinto Alcan's most modern and efficient facilities. A potential expansion project, announced in April 2008 and currently in pre-feasibility, would add approximately 170,000 tonnes to the current production of slightly more than 400,000 tonnes, making Alma one of the largest smelters in North America. The cost of the Alma expansion is estimated at approximately US$1 billion. The project has been deferred due to the current economic downturn.

Cameroon (Rio Tinto: 47 per cent and 100 per cent)
In October 2005, Rio Tinto Alcan signed a memorandum of understanding with the Government of Cameroon, which was then amended in November 2007, to provide for the expansion of the Alucam smelter and development and construction of a greenfield aluminium smelter. Under the agreed upon terms, Alucam, a joint venture in which Rio Tinto Alcan owns a 47 per cent interest, would build a 300 megawatt power dam and a 200,000 tonne per year expansion of the existing smelter. In addition, a 930 megawatt power dam would be developed together with a 400,000 tonne per year greenfield aluminium smelter by Rio Tinto Alcan on a 100 per cent basis. The expansion and the greenfield smelter are at different stages of development, but when completed both would be positioned in the first half of the industry cost curve.

Boyne Island Smelters Limited (Rio Tinto: 59 per cent)

Rio Tinto Alcan and its joint venture partners are investing in two projects to modernise and extend the life of the Boyne Island aluminium smelter in Australia. The first project is related to the necessary replacement of two carbon baking furnaces, which supply anodes to two of the smelter's reduction lines. The second project is related to the replacement of mobile cranes and upgrade of associated runways on two reduction lines. Both projects are high priority end of life replacements and are required in order for the reduction lines to continue operating. The crane and runway refurbishment project is also required in order to meet current safety standards and statutory regulations.

Coega (Rio Tinto: 80 per cent)
As a result of power supply shortages in South Africa, the smelter project at Coega has been delayed pending confirmation that ESKOM, South Africa's national power utility, will be able to supply electricity under the Electricity Supply Agreement signed in November 2006. The project team has been reduced, with small teams retained in Port Elizabeth and Johannesburg.

Saudi Arabia
In December 2008, Rio Tinto Alcan and Ma'aden announced that their relationship will be one of cooperation rather than one of equity partnership. The group is in discussions with Ma'aden to potentially provide technology support for the smelter project as well as general advice and support. Although Rio Tinto Alcan will not be an equity partner at this stage of the project, the parties have agreed to consider the possibility of participation at a later date.

Sarawak (Rio Tinto: 60 per cent)
In August 2007, Rio Tinto Alcan and Cahya Mata Sarawak Berhad signed a heads of agreement for the proposed development of a smelter in the State of Sarawak, Malaysia. Pre-feasibility work has been undertaken and joint venture agreements are being finalised. Under the joint venture, detailed feasibility studies on the design, engineering, construction, commissioning and operation of a smelter with an initial capacity of 720,000 tonnes will be undertaken. The smelter is expected to have the capability to be expanded to 1.5 million tonnes per annum. When completed, the smelter is expected to be positioned in the first quartile of the industry cost curve.