Skip to main content [Access key S]
Rio Tinto logo
Home Operations & financial report Mineral resources

Operations & financial report

Mineral resources

As required by the Australian Securities Exchange, the following tables contain details of other mineralisation that has a reasonable prospect of being economically extracted in the future but which is not yet classified as Proved or Probable Reserves. This material is defined as Mineral Resources under the JORC Code. Estimates of such material are based largely on geological information with only preliminary consideration of mining, economic and other factors. While in the judgement of the Competent Person there are realistic expectations that all or part of the Mineral Resources will eventually become Proved or Probable Reserves, there is no guarantee that this will occur as the result depends on further technical and economic studies and prevailing economic conditions in the future. Where operations are not managed by Rio Tinto the resources are published as received from the managing company.

Resources are stated as additional to the reserves reported earlier.




Likely mining
method (a)
Measured resources
at end 2007
Indicated resources
at end 2007
Inferred resources
at end 2007
Total resources 2007
compared with 2006
Rio Tinto
interest %

Tonnage Grade Tonnage Grade Tonnage Grade Tonnage Grade
2007 2006 2007 2006
BAUXITE millions of tonnes % Al2O3 millions of tonnes % Al2O3 millions of tonnes % Al2O3 millions of tonnes millions of tonnes % Al2O3 % Al2O3
Gove (Australia) (b) O/P 37 50.4 43 49.8 3 50.3 83 - 50.1 - 100.0
Sangaredi (Guinea) (b) O/P 226 51.4 202 48.9 233 48.2 661 - 49.5 - 22.9
Porto Trombetas (MRN) (Brazil) (b) O/P 444 50.0 444 - 50.0 - 12.0
Weipa (Australia) (b) O/P 133 48.9 2,086 51.0 2,219 2,114 50.9 51.0 100.0
BORATES millions of tonnes millions of tonnes millions of tonnes millions of tonnes millions of tonnes
Rio Tinto Minerals-Boron (US) O/P 5.3 0.1 5.4 5.4 100.0
Coal type (c) Coal resources at end 2007
Measured Indicated Inferred
COAL millions of tonnes millions of tonnes millions of tonnes millions of tonnes millions of tonnes
Chapudi (South Africa) (d) O/C SC 90 220 730 1,040 - 59.1
Rio Tinto Coal Australia (Australia)
Bengalla O/C+U/G SC 30 81 59 170 170 30.3
Blair Athol (e) O/C SC - 4 71.2
Clermont O/C SC 11 4 15 15 50.1
Hail Creek O/C MC 117 118 235 235 82.0
Hunter Valley Operations O/C+U/G SC+MC 119 575 698 1,392 1,392 75.7
Kestrel U/G MC 9 9 - 80.0
Kestrel West U/G SC+MC 153 153 165 80.0
Lake Elphinstone O/C SC+MC 61 17 78 78 82.0
Maules Creek O/C+U/G SC+MC 160 520 680 680 75.7
Mount Pleasant O/C+U/G SC+MC 200 218 281 699 699 75.7
Mount Thorley Operations U/G SC+MC 30 68 17 115 115 60.6
Oaklands O/C SC 480 800 1,280 1,280 75.7
SW Yarraman (f) O/C SC - 111 100.0
Tarong-Kunioon (f) O/C SC - 727 100.0
Tarong-Meandu (f) O/C SC - 335 100.0
Valeria O/C SC 200 240 440 440 71.2
Vickery O/C+U/G SC+MC 100 200 300 300 75.7
Warkworth O/C+U/G SC+MC 104 287 32 423 423 42.1
Winchester South O/C SC+MC 90 7 97 97 75.0
Rio Tinto Energy America (US)
Antelope (g) O/C SC 73 73 - 100.0
Colowyo (h) O/C+U/G SC 159 68 21 248 192 100.0
Decker (i) O/C SC 43 43 63 50.0

See notes at the bottom of this page




Likely mining
method (a)
Measured resources
at end 2007
Indicated resources
at end 2007
Inferred resources
at end 2007
Total resources 2007
compared with 2006
Rio Tinto
interest %

Tonnage Grade Tonnage Grade Tonnage Grade Tonnage Grade
2007 2006 2007 2006
COPPER millions of tonnes grade %Cu millions of tonnes grade %Cu millions of tonnes grade %Cu millions of tonnes millions of tonnes % Cu % Cu
Bingham Canyon (US) O/P 9 0.34 9 8 0.34 0.37 100.0
Eagle (US) (j) U/G 0.3 2.51 0.3 2.19 0.6 4.1 2.34 2.89 100.0
Escondida (Chile) (k)
- sulphide O/P 1.1 0.69 141 0.80 598 0.83 740 865 0.83 0.85 30.0
- sulphide leach O/P 37 0.44 447 0.42 3,128 0.47 3,612 4,797 0.47 0.47 30.0
- oxide O/P 39 0.86 39 14 0.86 1.09 30.0
Grasberg (Indonesia) (l) O/P+U/G 683 0.59 2,121 0.56 245 0.37 3,049 2,787 0.55 0.53 (l)
Northparkes (Australia) (m)
- open pit O/P 8.4 0.55 3.6 0.36 12.0 1.8 0.49 0.64 80.0
- underground U/G 16 0.82 2.4 0.18 18 26.4 0.79 0.80 80.0
Oyu Tolgoi (Mongolia) (n)
- South Oyu O/P 189 0.43 267 0.34 456 - 0.38 - 9.9
- Hugo South U/G 490 1.05 490 - 1.05 - 9.9
- Hugo North U/G 703 1.82 723 0.97 1426 - 1.39 - 9.9
- Hugo North Extension U/G 117 1.80 96 1.15 213 - 1.51 - 13.5
Palabora (South Africa) (o)
- stockpiles 7.9 0.31 7.9 16.6 0.31 0.27 57.7
DIAMONDS millions of tonnes carats per tonne millions of tonnes carats per tonne millions of tonnes carats per tonne millions of tonnes millions of tonnes carats per tonne carats per tonne
Argyle (Australia)
AK1 pipe U/G 40 2.9 26 3.1 9.3 2.0 75 75 2.9 2.8 100.0
Alluvials O/P 11 0.2 8.0 0.2 9.0 0.2 28 28 0.2 0.2 100.0
Diavik (Canada) O/P+U/G 4.1 3.1 3.6 3.2 7.7 7.7 3.1 3.0 60.0
Murowa (Zimbabwe) O/P 1.4 0.4 1.4 1.4 0.4 0.4 77.8
GOLD millions of tonnes grammes per tonne millions of tonnes grammes per tonne millions of tonnes grammes per tonne millions of tonnes millions of tonnes grammes per tonne grammes per tonne
Bingham Canyon (US) O/P 9 0.28 9 8 0.28 0.30 100.0
Cortez/Pipeline (US) (p) (ll) O/P+U/G 6.8 1.45 62 1.57 18 5.25 87 73 2.30 2.62 40.0
Grasberg (Indonesia) (l) O/P+U/G 683 0.49 2,121 0.50 245 0.40 3,049 2,787 0.49 0.46 (l)
Greens Creek (US) (ll) U/G 0.3 4.54 2.1 4.42 2.4 2.2 4.43 4.55 70.3
Northparkes (Australia) (m)
- open pit O/P 8.4 0.42 3.6 0.21 12.0 1.8 0.35 0.56 80.0
- underground U/G 16 0.30 2.4 0.18 18 26.4 0.29 0.25 80.0
Oyu Tolgoi (Mongolia) (n)
- South Oyu O/P 189 0.27 267 0.23 456 - 0.25 - 9.9
- Hugo South U/G 490 0.09 490 - 0.09 - 9.9
- Hugo North U/G 703 0.39 723 0.30 1,426 - 0.34 - 9.9
- Hugo North Extension U/G 117 0.61 96 0.31 213 - 0.48 - 13.5
Wabu (Indonesia) O/P 43 2.56 43 43 2.56 2.56 (l)

See notes at the bottom of this page




Likely mining
method (a)
Measured resources
at end 2007
Indicated resources
at end 2007
Inferred resources
at end 2007
Total resources 2007
compared with 2006
Rio Tinto
interest %

Tonnage Grade Tonnage Grade Tonnage Grade Tonnage Grade
2007 2006 2007 2006
IRON ORE millions of tonnes %Fe millions of tonnes %Fe millions of tonnes %Fe millions of tonnes millions of tonnes %Fe %Fe
Channar (Australia) (q) O/P 25 61.9 25 45 61.9 62.0 60.0
Corumbá (Brazil) (r) O/P 38 64.1 51 63.4 493 62.6 583 429 62.7 62.7 100.0
Eastern Range (Australia) (s) O/P 10 61.6 5 61.7 15 61.8 30 60 61.7 61.8 54.0
Hamersley (Australia)
- Brockman 2 (t) O/P 5 62.9 5 62.2 10 5 62.6 62.5 100.0
- Brockman 4 (t) O/P 15 62.1 15 61.9 5 62.6 35 30 62.1 61.9 100.0
- Hope Downs 1 Marra Mamba (u) O/P 5 61.8 60 62.1 30 60.2 95 70 61.4 62.0 50.0
- Hope Downs 1 Detritals (u) O/P 25 59.5 25 70 59.5 59.7 50.0
- Marandoo Marra Mamba O/P 95 62.0 75 62.3 390 62.5 560 565 62.4 62.3 100.0
- Mt Tom Price high grade (q) O/P 35 63.2 55 64.1 10 64.5 100 120 63.9 63.9 100.0
- Mt Tom Price low grade O/P 30 56.8 25 55.2 5 54.8 60 55 55.9 56.0 100.0
- Mt Tom Price Marra Mamba (v) O/P 15 61.8 15 10 61.8 61.7 100.0
- Nammuldi Detrital (w) O/P 5 60.4 75 60.7 80 100 60.7 61.1 100.0
- Nammuldi Marra Mamba (x) O/P 110 62.9 165 62.7 275 220 62.8 62.6 100.0
- Paraburdoo Brockman (y) O/P 15 62.8 75 63.8 90 125 63.6 63.5 100.0
- Yandicoogina O/P 290 57.9 355 58.0 30 57.8 675 675 57.9 57.9 100.0
Undeveloped resources (z)
- Hamersley Brockman ore O/P 40 62.6 1,530 62.5 2,210 62.5 3,780 3,760 62.5 62.5
- Hamersley Brockman Process ore (aa) O/P 220 57.6 460 57.5 1,105 54.4 1,785 - 55.6 -
- Hope Downs Brockman ore (bb) O/P 170 61.9 215 62.4 385 290 62.2 61.9
- Hope Downs Brockman Process ore (aa) O/P 80 56.4 115 57.1 195 - 56.8 -
- Marra Mamba ore O/P 640 62.3 1,650 62.1 2,290 2,105 62.2 62.4
- Channel Iron deposits (cc) O/P 1,750 57.0 1,750 875 57.0 57.2
- Detrital deposits (dd) O/P 5 63.4 140 61.8 90 60.1 235 190 61.2 61.0
Iron Ore Company of Canada (Canada) O/P 217 65.0 362 65.0 871 65.0 1,449 1,371 65.0 65.0 58.7
Palabora (South Africa) (ee) O/P 240 55.9 240 - 55.9 - 57.6
Robe River (Australia)
- Pisolite developed resources O/P 100 56.3 5 57.0 30 56.7 135 130 56.4 56.4 53.0
- Pisolite undeveloped resources O/P 50 58.9 1,020 58.3 460 57.7 1,530 1,585 58.1 58.3 53.0
- Marra Mamba developed resources (ff) O/P 65 62.3 125 62.3 190 150 62.3 62.4 53.0
- Marra Mamba undeveloped resources (ff) O/P 270 61.5 175 59.3 445 355 60.6 61.4 53.0
LEAD millions of tonnes %Pb millions of tonnes %Pb millions of tonnes %Pb millions of tonnes millions of tonnes %Pb %Pb
Greens Creek (US) (ll) U/G 0.3 3.41 2.1 4.00 2.4 2.2 3.92 4.04 70.3
MOLYBDENUM millions of tonnes %Mo millions of tonnes %Mo millions of tonnes %Mo millions of tonnes millions of tonnes %Mo %Mo
Bingham Canyon (US) O/P 9 0.039 9 8 0.039 0.043 100.0
NICKEL millions of tonnes %Ni millions of tonnes %Ni millions of tonnes %Ni millions of tonnes millions of tonnes %Ni %Ni
Eagle (US) (j) U/G 0.3 2.99 0.3 2.37 0.6 4.1 2.65 3.59 100.0
POTASH millions of tonnes %KCl millions of tonnes %KCl millions of tonnes %KCl millions of tonnes millions of tonnes %KCl %KCl
Potasio Rio Colorado (Argentina) (gg) S/M 360 34.2 677 31.0 1,037 - 32.1 - 100.0
SILVER millions of tonnes grammes per tonne millions of tonnes grammes per tonne millions of tonnes grammes per tonne millions of tonnes millions of tonnes grammes per tonne grammes per tonne
Bingham Canyon (US) O/P 9 1.7 9 8 1.7 2.0 100.0
Grasberg (Indonesia) O/P+U/G 683 3.5 2,121 3.3 245 1.8 3,049 2,787 3.2 2.9 (l)
Greens Creek (US) (ll) U/G 0.3 193 2.1 498 2.4 2.2 458 475 70.3
Wabu (Indonesia) O/P 43 2.5 43 43 2.5 2.5 (l)
TALC millions of tonnes millions of tonnes millions of tonnes millions of tonnes millions of tonnes
Rio Tinto Minerals - talc (Europe/N America/Australia) O/P+U/G 19 32 29 80 84 100.0
TITANIUM DIOXIDE FEEDSTOCK millions of tonnes millions of tonnes millions of tonnes millions of tonnes millions of tonnes
QIT (Canada) O/P 4.1 4.1 4.0 100.0
QMM (Madagascar) D/O 0.3 36.7 1.8 38.8 38.8 80.0
RBM (South Africa) (hh) D/O 2.9 0.1 3.0 1.3 50.0
URANIUM millions of tonnes %U3O8 millions of tonnes %U3O8 millions of tonnes %U3O8 millions of tonnes millions of tonnes %U3O8 %U3O8
Energy Resources of Australia (Australia)
- Jabiluka (ii) U/G 1.2 0.887 13.9 0.520 10.0 0.545 25.1 31.1 0.547 0.528 68.4
- Ranger #3 (jj) O/P 14.6 0.079 13.5 0.150 14.3 0.131 42.4 31.8 0.119 0.136 68.4
Rössing (Namibia) (kk) O/P 2.7 0.021 114.9 0.026 73.7 0.020 191.3 572.8 0.023 0.026 68.6
ZINC millions of tonnes %Zn millions of tonnes %Zn millions of tonnes %Zn millions of tonnes millions of tonnes %Zn %Zn
Greens Creek (US) (ll) U/G 0.3 7.94 2.1 10.46 2.4 2.2 10.12 10.35 70.3

See notes at the bottom of this page


Notes Expand
  • (a) Likely mining method: O/P = open pit; O/C = open cut; U/G = underground; D/O = dredging operation; S/M = solution mining
  • (b) Rio Tinto acquired the operating assets of Alcan with effect from 24 October 2007 and resources are presented here for the first time. The Weipa deposit includes the resource for Ely as the deposit is contiguous. Rio Tinto has an 80 per cent interest in the Awaso mine in Ghana but the resource estimate is still under review.
  • (c) Coal type: SC = steam/thermal coal, MC = metallurgical/coking coal.
  • (d) Following completion of technical and economic studies the resources at Chapudi are presented here for the first time.
  • (e) All resources at Blair Athol were upgraded to reserves.
  • (f) Contracts have been signed for the sale of the Tarong Meandu, Kunioon and SW Yarraman properties with transfer being effected on 31 January 2008.
  • (g) Resources at Antelope increased as a result of further drilling and mine planning studies.
  • (h) Resources at Colowyo were increased following the acquisition of the Collom lease.
  • (i) Resources at Decker were reduced following a boundary re-evaluation.
  • (j) Following completion of economic and technical studies at the Eagle project resources were largely upgraded to reserves.
  • (k) Reporting for Escondida and Escondida Norte is combined for 2007. The decrease in resources results from conversion to reserves and a change in economic parameters.
  • (l) Under the terms of a joint venture agreement between Rio Tinto and FCX, Rio Tinto is entitled to a direct 40 per cent share in resources discovered after 31 December 1994. The increase in resources results from the recategorisation of some reserve material.
  • (m) Following completion of a feasibility study, additional material was identified at Northparkes for open pit mining resulting in an increase in resources. Transfer of resources to reserves resulted in a decrease of underground resources.
  • (n) Whilst economic and technical studies continue at the Oyu Tolgoi deposits, resources are presented here for the first time.
  • (o) Stockpiles at Palabora decreased as the material was transferred for processing.
  • (p) The increase in resources at Cortez resulted from inclusion of additional material from the underground study area.
  • (q) Resources at Channar and Mt Tom Price (HG) have decreased as a result of the development of a new resource model and subsequent conversion of resources to reserves.
  • (r) Resources at Corumbá have increased mainly as a result of the re-evaluation of resources in lease extensions.
  • (s) Resources at Eastern Range have decreased as a result of new pit designs converting resources to reserves.
  • (t) Resources at Brockman 2 and Brockman 4 have increased as a result of the development of new resource models incorporating results from additional drilling.
  • (u) Additional drilling and re-modelling was completed for Hope Downs in 2007 resulting in new resource models and some reclassification of material.
  • (v) Resources of Marra Mamba ore at Mt Tom Price have increased following the transfer of material from reserves.
  • (w) Detrital iron ore resources at Nammuldi have decreased as a result of the development of new resource models incorporating results from additional drilling.
  • (x) Marra Mamba iron ore resources at Nammuldi have increased as a result of the development of new resource models incorporating results from additional drilling.
  • (y) Resources at Paraburdoo have been divided into Brockman and Marra Mamba ore types for the first time in 2007. Decreases are due to new pit designs converting all Marra Mamba resources to reserves and additional Brockman resources to reserves.
  • (z) Resources in this category consist of 36 separate deposits, 20 of which are wholly owned by Hamersley Iron. The previously included Shovelanna resource held by the Rhodes Ridge Joint Venture (RRJV) has been removed pending resolution of a dispute over tenure. The resource is the subject of mining lease applications by the RRJV. An external party has sought High Court leave to appeal the decision of the Western Australian Court of Appeal upholding the Minister for Resource's decision under the Western Australian Mining Act to terminate that party's earlier exploration licence applications. As at 6 February 2008, the leave application will be heard on a date to be set by the High Court.
  • (aa) Brockman Process ore is reported for the first time in 2007. This low grade material is derived from currently reported high grade resources these are not new deposits or extensions, but are contained within the mineralisation envelope that defines the high grade areas and are now economic. All material is reported as in-situ.
  • (bb) The increase in resources is derived from Hope Downs 4 and results from signifcant additional drilling, re-interpretation and re-estimation.
  • (cc) The increase in Hamersley Channel Iron Deposit resources results from the reporting of the Caliwingina North deposit for the first time in 2007.
  • (dd) The increase in Detrital Iron Deposit resources results from the reporting of new deposits for the first time in 2007 and re-evaluation of existing resources.
  • (ee) The magnetite stockpile resource at Palabora is reported for the first time following completion of economic studies.
  • (ff) The inclusion of high grade hydrated material increased resources for the Robe River Marra Mamba deposits.
  • (gg) Following completion of technical and economic studies the resource at Potasio Rio Colorado is reported for the first time. The resource is shown as estimated recoverable tonnes of material.
  • (hh) The introduction of tailings and stockpile material increased the resources at RBM.
  • (ii) Revision of the geological and resource model resulted in a decrease of resources at Jabiluka.
  • (jj) Additional resources at Ranger result from additional drilling and an updated Resource model plus additions to the low grade stockpiles.
  • (kk) A review of the evaluation methodology resulted in a net reduction in the resources at Rössing.
  • (ll) In February 2008 Rio Tinto entered into agreements to sell its interests in Greens Creek and Cortez.

© 2008 Rio Tinto – All rights reserved.