Energy Resources of Australia (Rio Tinto: 68.4 per cent)
In September 2007 ERA announced an extension to the Ranger open pit at a capital cost of A$57 million to extend mining until 2012. The pushback, when combined with optimisation of the existing pit, added an additional 10.7 million pounds of contained uranium oxide to reserves. The majority of the additional production from the extension will occur in 2011.

ERA has also approved expenditure of A$10 million for a prefeasibility study to examine options to further expand the mine and increase production from the processing plant. The study commenced in the third quarter of 2007 and will continue into 2008.

ERA's other capital expansion projects to process laterite ore and radiometrically sort low grade ores are well advanced with both projects scheduled for commissioning in the second quarter of 2008. The laterite processing plant will contribute approximately 0.88 million pounds per annum of uranium oxide to production from 2008 through to 2014. The radiometric sorter will upgrade lower grade ore and allow an additional 2.4 million pounds of uranium oxide to be produced over a five year period from 2008 to the end of 2013.

Exploration continued throughout the year including for the first time drilling through the wet season. Activity focused on further defining the down dip extension of the Ranger orebody, as well as understanding and defining the uranium resource to support the pre-feasibility study on further expansion of the mine.

Rössing Uranium (Rio Tinto: 68.6 per cent)
After years of working below capacity during a period of low uranium prices, in December 2005 approval was granted to restore annual production capacity to 8.8 million pounds per annum and extend the life of the operation until at least 2016. Total incremental and sustaining capital cost of the expansion is US$112 million.

In 2007, delays were experienced with the start of construction projects due to slow contractor tender submissions. Recruitment of staff has been slow due to skills shortages in southern Africa. Work is now progressing well.

Rio Tinto Coal Australia Clermont (Rio Tinto: 50.1 per cent)
Rio Tinto and its joint venture partners approved investment of US$750 million for the development of the Clermont thermal coal mine in central Queensland, situated 15 kilometres south east of the Blair Athol mine. Clermont will become Australia's largest thermal coal producer when it reaches full capacity, which is scheduled for 2013. The mine will be brought into production to replace Blair Athol, due to close in 2015, and will use Blair Athols' existing infrastructure and market position. To date construction has progressed to plan with boxcut production to commence in mid 2008 and first coal production expected in 2010.

Rio Tinto Coal Australia Kestrel (Rio Tinto: 80 per cent)
Rio Tinto and its joint venture partners approved investment of US$991 million for the extension of the Kestrel mine. This represents a 20 year investment in the Bowen Basin of Queensland to help meet Asian demand for metallurgical coal. First coal production from the extension is forecast for 2012 when the existing mine ceases production.

Coal & Allied Mount Pleasant (Rio Tinto: 75.7 per cent)
In 2006, Coal & Allied started a feasibility study on the Mount Pleasant coal mine project located adjacent to the Bengalla coal mine near Muswellbrook in the Hunter Valley, New South Wales. With continued uncertainty surrounding coal chain infrastructure in the Hunter Valley, further study is required before the feasibility study can be finalised.

Coal & Allied Lower Hunter Land (Rio Tinto: 75.7 per cent)
In 2006 Coal and Allied signed a memorandum of understanding with the New South Wales Government to facilitate the provision of extensive land conservation corridors in the Lower Hunter via the transfer of 80 per cent of the Company's post mining land holdings. The remaining 20 per cent is being considered for land development. Extensive community consultation continued through 2007 with various options considered. Feasibility studies will be conducted in 2008 to finalise these options.

Rio Tinto Energy America (Rio Tinto: 100 per cent)
During 2007 RTEA commenced construction of the Jacobs Ranch overland conveyor and in pit crusher project. This will reduce emissions and operating costs in addition to providing latent capacity for expansion (from around 38 million tonnes to around 45 million tonnes per annum). Commissioning is on schedule for completion in 2008. At Antelope and Spring Creek recent expansion projects were completed in 2007 and production is ramping up to meet market demand.