STRATEGIC OVERVIEW

Rio Tinto's Copper portfolio comprises a diverse mix of operations and projects along the development pipeline. During 2007 the focus on copper and molybdenum was supplemented by nickel.

The Copper group comprises Kennecott Utah Copper in the US and interests in the producing copper mines of Escondida in Chile, Grasberg in Indonesia, Northparkes in Australia and Palabora in South Africa. The group has management responsibility for Kennecott Minerals Company in the US and includes interests in undeveloped world class copper orebodies at La Granja in Peru, Oyu Tolgoi in Mongolia and Resolution in the US. Nickel projects in Indonesia and the US offer a pathway to becoming a top tier global nickel producer.

As one of the world's leading copper businesses, Rio Tinto's pipeline of projects position the Group to become the world's leading base metal producer by value creation. Recent exploration at the La Granja project in Peru has highlighted the potential for doubling forecast production to in excess of 500,000 tonnes per annum. Development work on Oyu Tolgoi is progressing well with significant further exploration potential in Mongolia. Average production is projected to be 440,000 tonnes per annum of copper and 320,000 ounces per annum of gold over the life of the mine. Rio Tinto has a 9.9 per cent interest in the Pebble copper, gold and molybdenum project in Alaska managed by the Northern Dynasty Minerals/Anglo American joint venture. Rio Tinto continues to be involved and monitor progress.

There are significant extension options in copper, gold and molybdenum at Kennecott Utah Copper and upside on the Resolution project, both in the US. In addition to these world class projects, the group is developing the E48 underground deposit at Northparkes. At Palabora, studies are progressing to evaluate an extension to the existing underground block cave lift, to explore the option of developing a second lift and to review options for enhancing revenue from magnetite stockpiles, a form of iron ore produced as a by-product of copper concentration.

Historically, the Copper group built the majority of its portfolio through acquisitions (Kennecott) or joint ventures (Escondida, Grasberg) followed by expansions. The current pipeline of projects represents a transition with a greater proportion of opportunities created through exploration and acquisitions at an early stage of development. The Copper group's long term development plans are not confined to its principal product. Rio Tinto has a number of nickel development opportunities which are currently being evaluated. At the small, high grade Eagle nickel deposit (Rio Tinto: 100 per cent) in Michigan in the US, feasibility studies were completed during 2007 and the decision to construct the underground mine was made in November 2007. In Indonesia, positive progress was made with the government on a Contract of Work for the Sulawesi Nickel project.

A Copper Projects team was formed in 2007 to manage the planning, development and related technology aspects of the portfolio of major projects, namely La Granja, Oyu Tolgoi, Resolution Copper, Keystone at Kennecott Utah Copper and Sulawesi Nickel. The team will collaborate with the Technology and Innovation group to focus on block cave design (with project work at Palabora), rapid construction (at Diavik), copper leaching (at La Granja) and nickel/cobalt recoveries (trials in Australia). With the significant ramp up of activities at each project site, there has been an elevated focus on safety systems especially in the area of contractor management.

Oyu Tolgoi, Resolution Copper and Kennecott Utah Copper's Bingham Canyon are amenable to being mined using the underground block caving technique. Unlike an open pit mine, which involves extensive removal of the surface waste rock to access the orebody, the block cave method accesses the orebody from underneath through a series of deep shafts and tunnels. These shafts and tunnels generate minimal waste rock. The block caving technique is currently being used at both Palabora and Northparkes. La Granja will rely on innovative leaching technology which will be confirmed as part of the prefeasibility work. Rio Tinto is well positioned to play its part due to its depth of technology and management skills.

Reflecting the tight market situation, copper prices during 2007 were in the range of US$2.37 per pound to US$3.77 per pound, about three times higher than their average level through the 1990s and well above levels achieved in the early part of this decade. Copper stocks have been at critically low levels since a surge of consumption in 2004 depleted available inventories. Since then, supply has been constrained while underlying demand has strengthened with Chinese economic growth. Prices could remain near current levels as long as production growth continues to lag the underlying demand trend. Strong Chinese demand growth is expected in 2008 while on the supply side issues include the likelihood of ongoing disruptions and possible constraints on the availability of sulphuric acid affecting solvent extraction and electro-winning (SxEw) operations. The importance of investment funds in exchange traded commodity markets means that large price movements could take place on the back of commodity specific speculative shifts or broader shifts in investor sentiment, well in advance of any fundamental change in physical markets. Looking to the long run, strong demand growth prospects are based on the expected resource intensive development of economies such as China and associated investment in power distribution networks and other infrastructure. On balance, there has been a structural shift in copper costs supporting the expectation of significantly higher long run prices than would be implied by historical trends.

As announced in November 2007, Rio Tinto is exploring options for the sale of a shortlist of assets, including three businesses from the Copper product group - Greens Creek (zinc, lead, silver) (Rio Tinto: 70 per cent), Cortez/Pipeline (gold)(Rio Tinto: 40 per cent) and Northparkes (copper, gold)(Rio Tinto: 80 per cent). These are all good businesses and any sales will be value driven and dependent on price. In February 2008 agreement was reached for the sale of the Greens Creek interest for US$750 million and for divestment of Rio Tinto's 40 per cent interest in the Cortez gold mine for US$1.7 billion, plus royalties.

At 31 December 2007, the Copper group, which also produces gold and molybdenum as significant co-products, accounted for six per cent of the Group's operating assets and in 2007 contributed approximately 25 per cent of Rio Tinto's gross sales revenue, of which 72 per cent was from copper, 12 per cent from molybdenum and the remainder mostly from gold. It accounted for 47 per cent of underlying earnings in 2007.

Bret Clayton, chief executive, Copper, is based in London.

View the text version of Mined (Rio Tinto share) '000 tonnes Copper View the text version of Reserves (Rio Tinto share) '000 tonnes Copper View the text version of Refined (Rio Tinto share) '000 tonnes Copper View the text version of Mined (Rio Tinto share) '000 ounces Gold View the text version of Reserves (Rio Tinto share) '000 ounces Gold View the text version of Underlying/adjusted earnings contribution (see note) US$m Copper View the text version of Underlying earnings 2005-2007 US$m

*A reconciliation of the net earnings with underlying earnings for 2005, 2006 and 2007 as determined under EU IFRS is set out in the Group financial performance. Adjusted earnings for 2003 have been determined under UK GAAP. All amounts presented by the product groups exclude net interest and other centrally reported items.

© 2008 Rio Tinto – All rights reserved.